Find help with dilapidation reports for Melbourne properties.

Dilapidation reports in Box Hill

Box Hill condition reports near high-rise sites and the SRL East works, and the pre-commencement report Whitehorse asks for with asset protection permits.

Box Hill, in the City of Whitehorse about 14 km east of the city, has gone through a high-rise construction boom and now has the tallest buildings outside central Melbourne. It is also the northern end of Suburban Rail Loop East, an underground line whose twin tunnels are now being built. Tower basements, an underground rail line and the steady stream of house and unit projects in the surrounding streets give Box Hill an unusually wide range of dilapidation work, from single houses to strata towers and shopping centre tenancies.

Whitehorse wants a pre-commencement report

Whitehorse City Council’s Asset Protection Permits page says an Asset Protection Permit is needed when a building permit has been issued or building or demolition works are proposed, and that owners or contractors must obtain it at least seven days before building work starts. The application must include:

  • A certificate of currency for the builder’s or contractor’s public liability insurance, at the level the council specifies.
  • A pre-commencement report on the council’s template, with photos of nearby council assets that may be affected, such as footpath, kerb, road, signs and trees.

The council will not process an application until the documents are in. Where council assets are damaged by building works, the permit holder is responsible for all repairs, and the council will not fix that damage as part of its normal maintenance. So in Whitehorse the photographic asset record is a permit requirement, not just good practice. Builders often have it prepared together with reports on neighbouring houses, as described in the infrastructure and asset survey guide.

Suburban Rail Loop East

SRL East will run 26 km in twin tunnels from Cheltenham to Box Hill, with trains due to carry passengers in 2035. The project’s tunnelling page says 2 of the 4 tunnel boring machines launching from Burwood will head north towards Box Hill, and that the northern machines are earth pressure balance machines, chosen to suit local ground conditions and minimise impacts on the surface.

The Suburban Rail Loop Authority lists proactive pre-construction and post-construction condition surveys of potentially affected properties among its measures. Owners near the route who are offered one should accept it and ask for a copy. Owners corporations with large common property, basements or heritage fabric sometimes also commission an independent survey so they hold a record prepared to their own brief.

High-rise and strata jobs

Situation Report usually commissioned
New tower with a deep basement beside an existing apartment block Protection work survey or pre-construction report on the neighbouring building’s facade, basement and common areas
Owners corporation near SRL or tower works Common property survey: car park, plant rooms, lobbies, external walls, podium waterproofing
Shop or office tenancy in a centre or tower Commercial lease condition report at handover and exit
House next to a new unit development Pre-construction dilapidation report on house, fences and paving

Basement car parks deserve particular care in a tower report. Existing cracks in slabs, walls and ramps, efflorescence and water staining, and the condition of drainage pits are exactly the items that come up after a deep excavation nearby. The inspector needs building manager access, and should note any areas they could not reach, such as locked storage cages.

Older housing around the centre

Away from the towers, the surrounding streets reflect decades of suburban growth, and post-war expansion included a Housing Commission estate in neighbouring Box Hill South. For a neighbour of a new development, a pre-construction report should cover boundary fences, driveways, paving and the walls facing the site. Clay soils that shrink and swell with moisture can produce cracks on their own, which is why a dated baseline matters so much.

Next step

Gather the addresses involved, the expected start date and, for strata buildings, the owners corporation’s authority and building manager contact, then send a Box Hill enquiry. Inspectors who receive enquiries through this site work independently and quote on their own terms. Camberwell, to the south-west, has more heritage housing and different council rules.

Send a job enquiry

Frequently asked questions

What is the Whitehorse pre-commencement report?

It is a council template, completed with photos of nearby council assets that may be affected, such as footpath, kerb, road, signs and trees. Whitehorse requires it with an Asset Protection Permit application, along with the builder's insurance certificate.

Will the Suburban Rail Loop project survey my property?

The Suburban Rail Loop Authority says it offers pre-construction and post-construction condition surveys of potentially affected properties on a proactive basis. If you are contacted, accept and ask for a copy of the report.

Our owners corporation is next to a tower site. What should the report cover?

Facades facing the site, basement slabs and walls, ramps, drainage pits, lobbies, plant rooms and any podium or roof areas. Interior access to individual lots needs each owner's or tenant's agreement.

How far ahead of works should a Box Hill builder book the asset record?

Early enough to lodge it with the permit application. Whitehorse asks for the permit at least seven days before building work starts, and the report has to be in before the application is processed.