Find help with dilapidation reports for Melbourne properties.

Dilapidation reports in Bentleigh

Bentleigh dilapidation and condition reports for homes and Centre Road shops, and what Glen Eira's asset protection rules mean for builders and neighbours.

Bentleigh is in the City of Glen Eira, about 13 km south-east of the city, with Bentleigh and Patterson stations on the Frankston line and a long strip of shops along Centre Road. The work that drives dilapidation reports here is a mix of houses being extended or rebuilt, units and townhouses going up on residential lots, and shopfront refits and rebuilds in the Centre Road strip, which has more than 250 retail businesses. Glen Eira’s own rules on council assets add a reason for every builder to keep a record.

Glen Eira’s Asset Protection Permit

Glen Eira City Council says an Asset Protection Permit is needed before any building or demolition works start. Its examples include swimming pools, safety barriers, shop fit-outs and fences, along with any associated excavation or demolition. Small jobs that do not need a building permit, fall under the council’s value threshold and involve no masonry or demolition are the exception.

Two points in the council’s guidance matter for dilapidation records:

  • The person in charge of a building site must tell council about any existing damage to council assets before building works start. The council says doing so protects them from having to pay for that damage.
  • Council assets include footpaths, nature strips, kerb and channel, pavement, stormwater drains, trees and signs. Damage during works, including from moving equipment, machinery or materials, can bring a penalty plus the full cost of repair or replacement.

The bond is set by lot type: a single frontage residential lot pays one amount, a corner lot with boundaries on two roads pays a larger one, and commercial or large developments are assessed individually. On a corner lot there are two frontages to photograph, and both need covering. The infrastructure and asset survey guide sets out a sound method.

Works within the road reserve, or a stormwater connection to council’s drains, need a separate Asset Consent Permit, so a builder doing both will often want the road reserve recorded in detail.

Typical Bentleigh jobs

Situation Suggested report
Neighbour demolishing a house to build two or more dwellings Pre-construction dilapidation report covering your house, fences and paving
Your builder starting a rebuild on a corner block Asset record of both street frontages for the permit, plus reports on neighbours
New double-storey close to the side boundary with underpinning Protection work survey agreed with the adjoining owner
Centre Road shop next to a refit or rebuild Commercial lease condition report or a shared wall record
Works done, cracks appearing Post-construction comparison against the earlier record

Local building features to record

Residential streets in Bentleigh carry a range of house types and ages, from older detached homes to recent townhouses and units. For a neighbour of a new development, the details that most often turn into disputes are:

  • Side and rear boundary fences, which are frequently removed, propped or replaced during works.
  • Concrete driveways and paths running along the boundary, where trucks, bins and excavators pass.
  • Garden walls, pool surrounds and outdoor paving near the dig.
  • Internal plaster cracks on the wall facing the site, which should be photographed with a scale even if they are tiny.

The Building and Plumbing Commission treats wall cracks under 1 mm as generally within normal foundation movement and suggests cracks between 1 and 5 mm be watched for a full year, per its foundation movement guide. A report that measures crack widths gives everyone a fair starting point against those thresholds.

Access tips

Rental properties need notice to the tenant through the agent, so allow extra lead time. Shops along Centre Road are easiest to inspect before opening hours or on a quieter weekday. If several neighbours are involved, a builder can save a lot of time by sending all owner contacts and the start date in one brief.

Next step

Have the site address, your property’s address, the council permit status if you are the builder, and the expected start date ready, then request a Bentleigh condition report. An independent provider quotes and books the visit; this website only forwards your enquiry. For pricing background, see the cost guide.

Send a job enquiry

Frequently asked questions

Does Glen Eira need to know about existing footpath damage before we start?

Yes. The council's guidance says the person in charge of the site must inform it of existing damage to council assets before building works begin, and that this protects them from paying for that damage.

We are on a corner block in Bentleigh. Does that change anything?

Glen Eira sets a higher bond for corner lots with boundaries on two roads. Photograph both frontages, including kerbs, crossings, pits and trees, before any work or deliveries start.

The units going up next door will take a year. Is one report enough?

A report before demolition and another when the works finish is the usual pattern. If damage appears during the build, photograph it with the date, tell the builder in writing and consider an interim inspection.

Can a shop tenant on Centre Road arrange a report without the landlord?

A tenant can commission a report on their own tenancy, but access to shared walls, roof spaces or the neighbour's side needs the relevant owner's permission. Telling the landlord early usually makes access easier.