Pre-construction dilapidation reports

What a pre-construction dilapidation report records, when Melbourne builders, councils and neighbours ask for one, and how to brief the inspector.

A pre-construction dilapidation report is a dated record of the condition of a building, and often the land and council assets around it, made before demolition, excavation or construction starts next door. It lists existing cracks, gaps, stains and other defects with photos and locations so that anyone can later tell old damage from new. It does not judge whether the building is sound; it records what is visible on the day.

Illustrative photo for Pre-construction dilapidation reports

Who asks for a report before work starts?

Four groups commission most of these reports in Melbourne:

  • Builders and developers who want a baseline for every neighbouring property before the excavator arrives, so a later complaint can be checked against photos rather than memory.
  • Neighbours who have received a protection work notice or simply see a site being fenced off next door.
  • Owners corporations, strata managers and facility managers looking after a building whose boundary wall, car park or common driveway sits beside a new development.
  • Applicants for council permits. Merri-bek City Council, for example, recommends attaching a dilapidation report or photos of footpaths, kerbs and other council assets to an asset protection permit application, and says that without them it will assume the assets were in good condition. Read the wording on the Merri-bek construction permits page.

Where the building surveyor has decided protection work is needed, a separate legal process applies. The protection work survey guide covers that case.

What does the inspector record?

A useful pre-construction report covers the parts of a property most likely to move when the ground next to it is dug, loaded or shaken:

Area Typical items recorded
Facades and boundary walls Brick and render cracks, mortar loss, lintel staining, out-of-plumb sections
Interior Plaster cracks at cornices and over doorways, sticking doors, tile cracks, floor slopes
Roof and gutters Cracked or slipped tiles, sagging gutters, flashing gaps, where safely visible
Paving and slabs Cracks and lifting in paths, driveways, patios and garage floors
Fences and retaining walls Lean, cracked panels, failed posts, bulging blockwork
Council assets out front Footpath, kerb and channel, nature strip, vehicle crossing, pits and signs

Each defect should have a photo, a location on a plan or room list, and a measurement where it can be taken, such as crack width read against a gauge. A photo of a crack without a scale or a reference point is much harder to compare later.

Choosing the scope

Not every property needs the same depth. The main choices are:

Option Suits Limits
External only Commercial premises, vacant land, owners who cannot give interior access Interior damage claimed later has no baseline
Full internal and external Houses, townhouses and units sharing a boundary with the site Needs access to every room and the owner’s time
Street and council assets only Builders lodging an asset protection permit Says nothing about neighbouring buildings
Multiple properties for one project Developers with several neighbours, strata complexes Needs a property list and access agreed with each owner

Inspections are carried out by people with different backgrounds, including registered building inspectors, builders, architects and engineers, so ask what qualifications the person attending holds and check any registration on the public register before you engage them.

What a careful inspector will need from you

  • The address of the construction site and a short description of the planned works: demolition, basement excavation, piling, a new double-storey home or a multi-unit build.
  • The expected start date. A report dated weeks after demolition started is of little use.
  • Access to every room, the roof space if safe, the garden and any outbuildings, plus the owner or occupier on site to point out defects they already know about.
  • Any existing reports, earlier repairs or insurance claims, so the record is honest about what was there before.

What a careful inspector will not do

A good inspector will not leave out defects to make a property look better, will not guess at causes in a pre-construction report, and will not sign off a report that the neighbour has not had a chance to see. They will also decline to open up walls, lift floor coverings or climb onto a roof that is unsafe. If they cannot see something, the report should say so.

Sharing the report matters. A record that both owners have a copy of, ideally signed or acknowledged by each, is far more persuasive later than one only the builder holds. The Building and Plumbing Commission explains how the agreed record works when protection work is involved on its protecting adjoining properties page.

Melbourne conditions that affect the report

Melbourne’s older suburbs carry plenty of movement that predates any neighbouring site: cracked brick veneer, settled verandahs and rooms that have been patched many times. Local councils also take different approaches to their own footpaths and kerbs. Box Hill applicants deal with the Whitehorse permit process, which asks for a pre-commencement report with photos, while City of Melbourne sites have their asset condition recorded by council before work begins. Clay soils that swell and shrink with the seasons can also open and close cracks, which is one reason the report should record the date and recent weather.

What it costs

For a single house, one published starting range is $400 to $600. Larger homes, several neighbouring properties, strata buildings and commercial sites are quoted on scope. The Melbourne dilapidation report cost guide explains what moves the price and how to compare quotes.

What to do next

Pin down the start date of the neighbouring works and how many properties need covering, then send the address and timing through the enquiry form. An independent inspector reviews the details and quotes directly; this website passes on the enquiry and plays no part in the inspection. When the works finish, the same record is the starting point for a post-construction condition report.

Send a job enquiry

Frequently asked questions

How long before the neighbouring works start should the inspection happen?

As close to the start as access allows, but before any demolition, site clearing or excavation. Booking a week or two ahead gives the inspector time to arrange access and send the report to both owners before machinery arrives.

Does a pre-construction report say whether my house is structurally sound?

No. It records visible defects on the day of inspection so they can be compared later. If you are worried about a crack or a lean, ask a structural engineer for an assessment as a separate job.

Who usually pays for the report?

It depends on who wants the record. Builders and developers often pay for reports on every neighbouring property. Where protection work is required, Victorian law sets out who bears the survey and related costs, so check the protection work process before assuming either way.

Can I refuse access to the inspector sent by the builder next door?

Outside the formal protection work process you can decline, but you then lose a shared record of your property's condition. Many owners allow access and also keep their own dated photos, or commission their own report.

Should the report include the footpath and kerb outside?

If you are the one doing the building work, yes. Several Melbourne councils hold the permit holder responsible for damage to council assets, and photos of their condition before work starts help when the council inspects at the end.