Find help with dilapidation reports for Melbourne properties.

How much does a dilapidation report cost in Melbourne?

Dilapidation report costs in Melbourne for 2026: what pushes the price up, what a quote should include and how to compare inspectors' quotes.

For one ordinary house, a national building inspection franchise publishes a starting range of $400 to $600 for residential dilapidation inspections on its dilapidation report page, and says the cost depends on property size and type. Most Melbourne jobs are not one ordinary house, though. Builders commission several neighbouring properties at once, owners corporations need common property in multi-storey buildings covered, and protection work surveys must be agreed by two owners. Those jobs are quoted on scope, and the factors below explain why two quotes for the same street can differ a lot.

The published starting range

Item Range Source and notes
Residential dilapidation inspection and report, one property $400 to $600 Published starting range for residential inspections; larger or more complex properties cost more

There is no regulated fee and no official price list for dilapidation reports in Victoria. Treat the figure above as a guide to the starting point for a single house, not a quote. Commercial premises, strata buildings, council asset surveys, infrastructure route surveys and agreed protection work surveys are priced individually.

What drives the price up or down?

Factor Why it changes the quote
Size and number of rooms Every room, elevation and outbuilding means more photos, more measurements and more report pages
Number of properties A builder covering five neighbours pays per property, though travel and setup can be shared
Building type Strata towers need common property, basements, plant rooms and lift access; heritage houses need closer detail
Purpose of the report A protection work survey has to be agreed with the adjoining owner and may need revisions before signing
Access Tenanted homes, locked plant rooms, building manager escorts and inductions add time
Council asset coverage Long frontages, corner sites and laneways add to the asset photo set
Report format Marked-up plans, crack gauge readings, video and digital delivery in a set format take longer
Follow-up inspection A post-construction comparison is often quoted with the first report; comparing against another firm’s report takes extra reading time
Timing Early starts, weekend visits or inspections booked at short notice before demolition can cost more

Strata, commercial and multi-property jobs

For apartment buildings, quotes are usually built from the common property areas to be covered (facades, basements, car parks, lobbies, plant rooms and roofs) plus a per-lot allowance for interior access where owners agree to it. Commercial premises are commonly priced on floor area and the amount of landlord plant to record. A developer with a long list of neighbours should ask for a per-property rate and a separate line for the council frontage record, so properties can be added or removed without a new quote.

What should a quote include?

A clear quote for a dilapidation report spells out:

  1. The properties and areas covered, room by room or elevation by elevation, and whether roof spaces, subfloors and outbuildings are included.
  2. Whether council assets out front are included, and how far along the street.
  3. The method: photos per defect, crack measurement, plan references, date stamps.
  4. Who receives the report, in what format and by when.
  5. Whether a follow-up post-construction inspection is included or priced separately.
  6. What happens if access is refused or a property needs a second visit.
  7. Who the inspector is and what qualifications or registration they hold.

What is usually not included

  • Council permit fees, levies and bonds. These are charged by the council to the permit holder and set on each council’s own page, for example the City of Melbourne asset protection levy page.
  • Structural engineering opinions on the cause of damage or the adequacy of proposed protection work.
  • The protection work insurance an owner must have in place, which the Building and Plumbing Commission says a standard construction and public liability policy will not normally cover.
  • Testing or servicing of plant, asbestos sampling, invasive inspection behind linings and roof access where it is unsafe.
  • Repairs of any kind.

Who pays?

It depends on why the report exists. A builder or developer usually pays for reports on neighbouring properties to protect themselves. A neighbour who wants their own record pays for it. Where protection work is required, the BPC explains that the building owner must pay the expenses the neighbour incurs in protecting their interests, including specialists’ fees to check the protection work documents and on-site supervision once the work begins. The protection work survey page has the detail. For commercial leases, who pays is usually a matter for the lease or for agreement between landlord and tenant.

How do you compare quotes fairly?

Put the quotes side by side against the same list: properties, areas, follow-up visit, delivery date and the inspector’s credentials. A cheap quote that covers only the facades facing the site, or delivers a photo dump with no locations, will cost more later if there is a dispute. Ask each provider for a sample report, ideally for a similar property, and check:

  • Can you find a given crack on the sample plan and in the photos?
  • Are crack widths measured, or just described as “minor”?
  • Does the report state what could not be accessed?
  • Is it dated, signed and clear about who commissioned it?

Red flags

  • A quote that does not name the properties or areas covered.
  • An inspector who offers to leave defects out, or to describe the property more favourably for the party paying.
  • Promises that the report will prove the builder caused damage, or will guarantee a claim succeeds.
  • No written terms, or terms that stop the report being shared with the neighbour or the council.
  • Reluctance to say who will attend and what their qualifications are.
  • Pressure to skip the post-construction visit to save money when large works are planned.

Ways to keep the cost down

  • Book all the neighbouring properties for one project with one provider and one start date, so travel and setup are shared.
  • Send owner and tenant contacts, floor plans and any earlier reports with the enquiry.
  • Agree access before the visit so the inspector does not have to come back.
  • Ask for the post-construction visit to be quoted at the same time as the first report.

Getting quotes

The pre-construction report guide explains scope choices, and the council asset survey guide covers frontage records. When you have the addresses and start date, ask for dilapidation report quotes. Pricing comes from the independent provider who takes up the enquiry, not from this site.

Send a job enquiry

Frequently asked questions

Is there a set fee for dilapidation reports in Victoria?

No. There is no regulated fee. Prices are set by each provider and depend on the size and number of properties, access, report format and whether a follow-up inspection is included.

Does a builder covering several neighbours pay the same per house?

Not always. Each property needs its own inspection and report, but sharing one visit day, one set of travel and one brief can bring the cost per property down.

Why do protection work surveys often cost more than basic reports?

They have to be agreed by both owners as a record before protection work begins, which usually means a more complete inspection, a draft for review and sometimes changes before signing.

Are council asset protection fees included in a report quote?

No. Councils set and charge their own permit fees, levies and bonds. The report quote covers the inspector's time, photos and the written record only.

Is it worth paying for a post-construction inspection?

If damage might be claimed, yes. A single pre-construction report shows the starting condition, but the comparison after the works is what shows whether anything changed.