Protection work surveys of adjoining property

When a building surveyor requires protection work in Victoria, the owner must survey the adjoining property first. How that survey works in Melbourne.

When a Victorian building surveyor decides that a project needs protection work, such as underpinning a neighbour’s footings or shoring an excavation along the boundary, the owner doing the building work must prepare a survey of the adjoining property with the adjoining owner before that protection work starts. The survey records all existing cracks and defects and must be signed or acknowledged as an agreed record of the property’s condition. In practice it is a dilapidation report that the law requires and that both owners have to accept.

Illustrative photo for Protection work surveys of adjoining property

Where does the requirement come from?

The protection work process sits in the Building Act 1993 and Part 7 of the Building Regulations 2018. Under the regulations, the relevant building surveyor must decide whether protection work is required when deciding the building permit application, and must consider matters including demolition, excavation, work on party walls and retaining walls, and the likely effect on the stability of the neighbouring property. The regulations are on the Victorian legislation site.

The Building and Plumbing Commission summarises the owner’s obligations on its protecting adjoining properties page:

  • Serve a protection work notice on the adjoining owner with details of the proposed work. A building permit may not be issued until the process is complete to the building surveyor’s approval.
  • The adjoining owner has 14 days to agree, disagree or ask for more information. No response within that time counts as agreement.
  • If they disagree or ask for more information, the building surveyor examines the proposal and decides. Either owner may appeal that decision to the Building Appeals Board within 14 days.
  • Have insurance in force covering damage by the protection work, protecting the adjoining property, its occupiers and the public during the works and for 12 months after completion. The BPC notes a standard construction and public liability policy will not normally provide the minimum cover.
  • Prepare a survey of the adjoining property with the adjoining owner, recording all existing cracks and defects, signed or acknowledged as an agreed record before protection work begins.
  • Pay the adjoining owner’s expenses of protecting their interests, including specialist fees to check the protection work documents and on-site supervision of the work.

The notice itself uses the prescribed Form 7, which the BPC publishes as a protection work template.

How the protection work survey differs from an ordinary report

Feature Informal dilapidation report Protection work survey
Trigger Anyone’s choice before nearby works Building surveyor’s determination that protection work is required
Who arranges it Builder, neighbour, owners corporation, council applicant The owner carrying out the building work, with the adjoining owner
Agreement Helpful but optional Must be signed or acknowledged as an agreed record before protection work begins
Disputes Builder, insurer, mediation or tribunal Adequacy of the survey can go to the Building Appeals Board
Cost Whoever commissions it Owner pays the expenses the adjoining owner incurs in protecting their interests

What a survey for protection work should cover

The survey should concentrate on the parts of the neighbouring property that the protection work and the excavation could affect, but stopping at the boundary wall is a mistake. Movement from underpinning or a basement dig can show up several rooms away. A thorough inspector will cover:

  1. Every elevation facing the site, plus the far side of the building for comparison.
  2. All interior rooms, with cracks measured against a gauge and located on a sketch plan.
  3. Floors, with notes on slope or bounce where obvious, and any visible subfloor.
  4. Paving, boundary fences, retaining walls, pools and outbuildings near the boundary.
  5. Services that can be seen, such as stormwater pits and downpipes running toward the site.
  6. Date, time, weather and the names of everyone present.

Both owners, or their representatives, should get the draft and have a fair chance to add items before signing. An adjoining owner who believes something is missing should say so in writing at this stage, not after the excavator has started.

Things a careful inspector will refuse to do

  • Leave a known defect out at either owner’s request.
  • Record a defect as new or existing without having seen it.
  • Sign the survey on behalf of an owner.
  • Give an engineering opinion on whether the proposed protection work is adequate, unless they hold the right qualifications and are engaged for that purpose.
  • Start inspecting the adjoining property without the adjoining owner’s permission.

Melbourne sites where this comes up

Protection work is common where a new double-storey home or townhouse is built close to a boundary, where basements are dug for apartments, and where an existing party wall is affected. Older inner suburbs with heritage streetscapes and infill apartments, such as Brunswick, and established middle-ring suburbs where houses are rebuilt close to their side boundaries, such as Bentleigh, are typical settings. Central city basements beside older buildings, covered on the City of Melbourne page, are another common setting.

Cost

Because a protection work survey has to be agreed and usually covers more of the property in more detail, it tends to cost more than a basic report on the same house. Check who is paying before the inspector is booked. The Melbourne cost guide lists the main price drivers, and a matching post-construction condition report closes the record once the works are done.

What to do next

If you have received or are about to serve a protection work notice, have the building surveyor’s determination and the neighbouring address ready, then request a protection work survey through the form. The site relays your request to an independent inspector; the scope, fee and survey itself are agreed between you and them.

Send a job enquiry

Frequently asked questions

I received a protection work notice. Do I have to respond?

You have 14 days from service to agree, disagree or ask for more information. If you do nothing in that time, Victorian law treats you as having agreed to the proposed protection work, so read the notice and plans promptly.

Who pays for my own adviser to check the proposed protection work?

The Building and Plumbing Commission says the owner doing the building work must pay the adjoining owner's expenses of protecting their interests, including specialists' fees to check the protection work documents and on-site supervision once it begins.

Can the survey be done after the protection work has started?

No. The survey of the adjoining property must be agreed as a record of its condition before protection work begins. A record made afterwards cannot show what the property looked like beforehand.

What if I think the survey is incomplete?

Put the missing items in writing to the building owner and the inspector before signing. If the owners cannot agree on the adequacy of the survey, the dispute can be referred to the Building Appeals Board.

Is a building surveyor the same as the person doing the survey?

No. The relevant building surveyor decides whether protection work is needed and oversees the process. The adjoining property survey is a condition record the building owner must prepare with the neighbour, and owners often engage an inspector to carry out the inspection and write it up.