Infrastructure and roadworks dilapidation surveys
Condition surveys of footpaths, kerbs, roads and buildings near Melbourne rail, road and council works, and what councils expect from permit holders.
An infrastructure dilapidation survey records the condition of public assets, such as footpaths, kerbs, channels, nature strips, drains, roads and street trees, and of buildings beside a road, rail or utility project, before the work begins. Builders need one to protect their asset protection bond. Property owners and owners corporations need one when a major project is about to dig, pile or tunnel near them. The survey turns the question of who damaged what into a comparison of dated photos.

Council assets: why the builder needs a record
Most Melbourne councils require a permit before building or demolition work that could damage council assets, and many hold a bond or security until the assets are inspected at the end. The detail differs from council to council:
| Council | What its published guidance says |
|---|---|
| City of Melbourne | Records the condition of assets that could be affected before works start and calls this the dilapidation report. Where works start without the asset protection levy paid, it says it will assume there was no existing damage to public assets. See the asset protection levy page. |
| Whitehorse | Asks for a pre-commencement report on its template, with photos of nearby council assets such as footpath, kerb, road, signs and trees, as part of the asset protection permit application. |
| Glen Eira | Requires the person in charge of a site to tell council about existing damage before building works start, which protects them from paying for it. |
| Merri-bek | Recommends attaching a dilapidation report or photos to the online application and assumes assets were in good condition if none are given. |
| Boroondara | Inspects its assets before refunding the bond, and emails the permit holder a list of anything that needs repair. |
Each council’s permit, fee and bond rules change from time to time, so read the current page for the site’s council before relying on this summary. The area pages for Box Hill, Bentleigh and Camberwell link to the relevant council.
What a council asset survey should show
- The full frontage of the site and a reasonable distance either side, including the opposite footpath where trucks will turn.
- Every footpath crack, lifted slab, broken kerb section, damaged pit lid and worn line marking, with a wide shot for location and a close shot for detail.
- Vehicle crossings, nature strips and street trees, including bark wounds and exposed roots.
- Signs, bollards, bike hoops and street furniture.
- Date stamps and a simple site plan showing where each photo was taken.
A survey that only shows the footpath directly in front of the gate tends to fail when damage is found two properties along.
Major projects near homes and strata buildings
Large transport projects run their own condition survey programs. The Suburban Rail Loop Authority lists offering pre-construction and post-construction condition surveys of potentially affected properties on a proactive basis among its measures for SRL East, which runs underground between Cheltenham and Box Hill. Its claims process states that an assessment of property damage will consider any condition survey previously carried out. Details are on the SRL claims page.
In the inner north, the Level Crossing Removal Project’s Brunswick works will take the Upfield line over 8 road crossings on a rail bridge of about 2.1 km, with new stations scheduled for 2033, according to the project page.
Where a project offers its own survey, take it up and ask for a copy. Some owners, especially owners corporations with large common property, also commission an independent record so they hold a version they control. Neither replaces the other.
Options compared
| Survey type | Commissioned by | Covers |
|---|---|---|
| Asset protection pre-commencement survey | Builder or permit holder | Council assets in the road reserve beside the site |
| Project condition survey | Project authority or its contractor | Properties identified as potentially affected |
| Independent owner survey | Owner, owners corporation or facility manager | The owner’s building and land, to their own brief |
| Linear route survey | Utility or civil contractor | A length of road, laneway or easement before trenching |
What a provider will ask for
The site address or route, the council area, the type of work (demolition, excavation, piling, trenching, tunnelling or heavy vehicle access), the expected start date, whether traffic management will be needed to photograph the roadway safely, and who needs copies. For strata buildings, have the owners corporation’s authority and access to basements, car parks and plant rooms arranged.
What a careful provider will not do
They will not step into live traffic to take a photo, will not enter rail or utility land without the asset owner’s permission, and will not claim a survey satisfies a council permit condition without checking that council’s current requirements. A council asset survey is also no substitute for the neighbouring-building record covered in the pre-construction report guide.
Cost
Asset surveys are usually priced on frontage length, the number of photos and the reporting format required. Route surveys are quoted on distance. Council permit fees and bonds are separate and set by each council. The cost guide explains how quotes are built.
What to do next
Note the site address, council and start date, then ask for an asset or infrastructure condition survey. Quotes and survey work come from independent providers that this website refers enquiries to.
Frequently asked questions
- Do I need my own survey if the council records the assets itself?
It is still worth keeping. A dated set of your own photos lets you check the council's record and respond quickly if damage is raised when you ask for the bond or security back.
- A rail project has offered a free condition survey. Should I accept?
In most cases, yes, and ask for a copy of the finished report. If you want a record you control, especially for strata common property, you can also commission an independent survey at your own cost.
- How far along the street should a council asset survey extend?
At least the full site frontage plus the frontages either side, and the opposite footpath and kerb where trucks and cranes will set up or turn. The council's own permit conditions may set a wider area.
- Can one survey cover both the council assets and the neighbours?
One provider can do both on the same visit, but they should be separate sections or reports. Neighbours need to see their part, and the council only needs the assets in the road reserve.
- Are council permit fees part of the survey quote?
No. Permit fees, levies and bonds are charged by the council to the permit holder. A survey quote covers only the inspection, photography and report.