Post-construction condition reports
A post-construction condition report compares a property after nearby works with its earlier record. When to book one in Melbourne and how it is used.
A post-construction condition report is the second half of a dilapidation record. Once the neighbouring demolition, excavation or building work is finished, an inspector returns to the same property, photographs the same locations and notes anything that has appeared or worsened since the first visit. The comparison is what makes it useful: a new crack beside one that was already measured tells a very different story from a crack nobody wrote down.

When is a follow-up inspection worth booking?
- At the end of a project, once heavy machinery has left and the site is mostly enclosed, so the record covers the noisy phases.
- When damage shows up during the works. A door that suddenly binds, a fresh crack over a window or water coming through a boundary wall should be photographed straight away and reported to the builder in writing. An interim inspection can follow.
- Before a bond or security is released. Councils inspect their footpaths and kerbs before handing back asset protection bonds, and builders want their own evidence at the same point.
- When a claim is being assessed. Infrastructure projects and insurers look at earlier condition records. The Suburban Rail Loop Authority, for instance, states that its assessment of a damage claim will consider any property condition survey previously carried out. See its property and personal injury claims page.
How the comparison is done
The second inspector needs the first report. Without it, a post-construction visit is just another condition report with nothing to measure against. A sound comparison report will:
- Follow the room and elevation order of the original, so each item can be matched.
- Re-photograph each recorded defect from a similar angle and distance, with the same type of scale or crack gauge.
- List changes in three groups: defects unchanged, defects that have grown, and defects that were not in the earlier record.
- Note anything that could not be reinspected, such as a room that was locked or furniture moved over a recorded crack.
- Avoid declaring a cause unless the inspector is qualified to assess it and says what that opinion is based on.
| Finding | What it usually means | Common next step |
|---|---|---|
| No change | The record supports the view that the works did not affect the property | File both reports with the property records |
| Existing defect has widened | Movement has occurred, cause still open | Ask for an engineer’s opinion before agreeing to repairs |
| New defect near the boundary | Possible effect of the works | Notify the builder or owner in writing with the report |
| New defect far from the works | Often seasonal or unrelated movement | Keep monitoring, take dated photos |
Who is entitled to see the result?
Whoever paid for the report owns it, subject to the agreement with the inspector. If the builder paid, ask in writing for a copy before the inspector arrives. Where the earlier record was an agreed survey made under the protection work process, both owners should already hold the baseline. The protection work survey guide explains how that agreed record is made.
Limits of a condition report
A post-construction report is a record, not a ruling. It cannot prove that a crack was caused by vibration rather than seasonal clay movement, a leaking pipe or an old repair failing. When the dollars involved are significant, a structural engineer may be needed to give an opinion on cause, and disputes about building work can end up with the parties’ insurers, a mediator or a tribunal. A careful inspector will not overstate what the photos show and will not change wording in the builder’s or the neighbour’s favour on request.
The Building and Plumbing Commission’s guidance on protecting adjoining properties explains that disputes over insurance cover or the adequacy of an adjoining property survey can be referred to the Building Appeals Board. That route is specific to protection work; most other disagreements start with the builder and their insurer.
Local conditions worth noting
The Building and Plumbing Commission explains that reactive clay soils shrink or swell as their moisture changes, and that foundation movement from this, from soil settling or from tree roots can crack walls with no building site anywhere nearby. Its foundation movement guide treats wall cracks under 1 mm as generally part of normal movement and says cracks of 1 to 5 mm should be monitored over a full year of weather. A good comparison report records the dates of both visits so a reader can see whether they fell in different seasons. Older housing stock, like the Victorian and Edwardian houses around Camberwell, often has lime mortar and earlier repairs that move differently from modern brick veneer. In high-rise areas such as Box Hill, follow-up inspections tend to cover strata common property and basements rather than single houses.
Cost
Follow-up visits are usually priced from the original scope, because the inspector is matching an existing list. If the first report was done by someone else, expect the quote to allow time to read and follow that record. The cost guide sets out the factors.
What to do next
Find the original report and the date the neighbouring works ended, then ask for a post-construction inspection through the enquiry form. The form passes your details to an independent inspector, who sets the price, the visit time and the report terms with you. If no earlier record exists, a pre-construction report on the next project is the fix for future works.
Frequently asked questions
- Can a different inspector do the post-construction report?
Yes, as long as they have the full earlier report with its photos and locations. Expect them to spend extra time matching their visit to someone else's layout, and check the earlier report allows its use for comparison.
- What if no report was done before the works started?
A condition report made now still records the current state, but it cannot show what changed. Dated photos you took earlier, real estate listing photos and repair invoices can help fill the gap.
- Will the report say the builder caused the damage?
Usually not. It lists what is new or worse since the first visit. An opinion on cause normally needs an engineer or another qualified expert, and should state the evidence it relies on.
- How soon after the works finish should I book it?
Once excavation, piling and heavy deliveries are over. If damage appears earlier, photograph it with the date and notify the builder in writing straight away rather than waiting for the final inspection.