Find help with dilapidation reports for Melbourne properties.

Dilapidation reports in Melbourne 3000

Dilapidation and condition reports for Melbourne CBD towers, heritage buildings, strata and tenancies, and what City of Melbourne asks of builders.

Central Melbourne packs towers, heritage shopfronts, laneway warehouses and apartment blocks onto lots that often share walls or sit a few metres apart. When one of them is demolished or a basement is dug, the buildings around it, and the footpaths and roads out front, are exposed to vibration, ground movement and heavy vehicle loads. The City of Melbourne also has its own rules on public assets and construction management that shape how condition records are made here.

How the City of Melbourne treats its assets

The council’s asset protection levy and securities page sets out the approach for builders:

  • Building work above a set value that needs a building permit attracts a non-refundable asset protection levy, which must be paid before works start.
  • Depending on the works, the council may also require a security, as a bank guarantee or deposit, for example where hoardings, gantries or scaffolds will extend over the street alignment. A separate tree protection security can apply where public trees could be affected.
  • Before works start, the council records the condition of assets that could be affected and calls that record the dilapidation report. It may inspect during the works, and may use video, which it calls a CCTV survey, to check whether damage was caused by them.
  • If building works start without the levy being paid, the council says it can fine the builder and will assume there was no existing damage to public assets before the works.

The council’s own record is made for the council. Builders in the CBD keep their own photographic record of the footpath, kerb, channel, pits and street furniture along the frontage. If the council’s record misses a cracked slab, the builder’s dated photos are the way to show it was already there. The infrastructure and council asset survey guide explains what that record should include.

Construction management plans

The City of Melbourne requires a construction management plan for works that will take four weeks or longer and could disrupt road users, that involve excavation below the level of the roadway or footpath, or that involve demolition needing public space. The plan has to cover each stage of demolition, excavation and construction, and the application must list prior approvals, including approvals for protection of the public under the Building Regulations 2018, such as hoardings and gantries. Details are on the construction management plans page. Protecting the public on the street is a different thing from protection work for an adjoining property, so a basement dig beside an existing building can need both a plan for the street and a separate agreed survey of the building next door.

Typical jobs in the CBD

Situation Report usually needed
New tower with a basement beside older buildings Protection work survey of each adjoining building, plus a council asset record
Demolition of a laneway warehouse Pre-construction reports on neighbours sharing walls or the laneway
Owners corporation of an apartment tower next to a new site Common property survey: facade, podium, car park, plant rooms, lobby
Retail or office tenancy changing hands Commercial lease condition report at start or end of lease
Works finished next door Post-construction condition report against the earlier record

Access and timing quirks

Inspecting central city buildings takes planning. Many towers need building manager approval, a lift booking, induction or an escort for plant rooms and basements. Upper-level facades are often only visible from the street, a neighbouring roof or a window cleaning platform, so a report should say how each elevation was viewed. Laneway frontages can be blocked by loading and waste collection at set times. Heritage facades with render, cast iron and timber joinery need closer photographs than a modern curtain wall, because small cracks and loose elements are easier to miss.

Strata buildings bring their own step: the owners corporation or its manager has to authorise inspection of common property, and individual lot owners have to agree to interior access. Without that sorted early, a report can end up covering the lobby and car park but none of the apartments next to the excavation.

Nearby areas

This site also takes enquiries from inner suburbs north and east of the city. Brunswick has its own mix of heritage shops and infill apartments, and Box Hill has the tallest towers outside the CBD and sits at the northern end of Suburban Rail Loop East.

Getting a report organised

Collect the site address, the neighbouring addresses, the building manager’s contact details and the expected start date of the works, then send a CBD dilapidation enquiry. An independent inspector takes it from there with their own quote and terms; the about page explains how referrals through this site work.

Send a job enquiry

Frequently asked questions

Does the City of Melbourne do its own dilapidation report on council assets?

Yes. Its published guidance says it records the condition of assets that could be affected before works start. It also says that if works start without the levy paid, it will assume public assets had no existing damage. Builders often keep their own record as well.

We manage an apartment tower next to a new development. Where do we start?

Get the owners corporation's authority to inspect common property, then contact lot owners on the side facing the site for interior access. Ask the developer whether they are offering condition surveys and request a copy.

Can a CBD report include the upper floors of a facade?

Usually only as far as they can be seen safely, from the street, a neighbouring roof or an internal window. The report should say how each elevation was viewed and note any parts that could not be inspected.

Which postcode does this page cover?

It covers Melbourne 3000, the central city. Enquiries from surrounding inner suburbs are also accepted, and the inspector who quotes confirms whether they can attend a particular address.