Find help with dilapidation reports for Melbourne properties.

Commercial lease condition reports

Condition reports for shops, offices and warehouses at lease start and lease end in Melbourne, and how they help with make good and repair disputes.

A commercial lease condition report is a dated record of the state of leased premises, made when a tenant moves in and again when they move out. It covers the structure, finishes, fixtures and the landlord’s plant and equipment. Landlords and tenants use the two reports to settle make good obligations, repair responsibilities and bond deductions with evidence instead of recollection.

Illustrative photo for Commercial lease condition reports

Why the start of the lease matters most

For retail premises in Victoria, the Victorian Small Business Commission says the Retail Leases Act 2003 makes repairs and maintenance of certain items the landlord’s responsibility, and that the Act overrides lease clauses on those points. The landlord must keep the structure, the fixtures, the plant and equipment, and the service-related appliances and fittings it provides in the same condition as when the lease was entered into, subject to exceptions such as tenant misuse. The VSBC advises tenants to ask for a copy of the condition report and take photos before taking possession. Read the detail on its repairs and maintenance page.

That obligation is measured against the condition at the start, so a start-of-lease report is the reference point for the whole term. Office, industrial and other leases outside the retail legislation depend more heavily on the lease wording, and a condition schedule attached to the lease is often the only description of what the premises looked like on handover.

Lease start and lease end compared

Stage Main purpose Usually commissioned by
Lease start Fix the baseline condition, record existing damage and the landlord’s plant Landlord, managing agent or a careful tenant
During the term Record damage from a defect, leak or a neighbour’s works Whichever party is affected
Lease end Compare with the baseline, list make good items, support bond release Landlord, tenant, or both jointly

A joint inspection at lease end, with both parties or their agents present, tends to shorten arguments. Where that is not possible, each side may commission its own report.

What the inspector records in commercial premises

  • Shopfront glazing, entry doors, signage fixings and awnings.
  • Floor finishes, ceiling tiles and grid, partitions, wall linings and paint.
  • Amenities: toilets, kitchenettes, tapware and visible plumbing.
  • Landlord’s plant that can be seen and operated, such as split systems, hot water units, roller doors and lighting, noted as working or not working on the day.
  • Roof, gutters and downpipes where safely visible, especially water staining inside.
  • Warehouse slabs, racking fixings, dock levellers and yard paving.
  • Fit-out items the tenant installed, flagged separately so they are not confused with the base building.

A condition report is not a test of plant, a fire safety audit or a structural assessment. If the lease requires those, they are separate jobs by the right specialists.

Neighbouring works during a lease

Shops on strips like Sydney Road in Brunswick or Centre Road in Bentleigh may share a wall with the next premises. When the neighbour starts demolition or a rebuild, both landlord and tenant have reason to get a pre-construction dilapidation report on the shared wall, ceiling and floor, so any damage can be traced and claimed against the right party.

What a careful inspector will and will not do

They will photograph every area in a consistent order, use a floor plan reference for each photo, and state what could not be accessed, such as a locked comms room. They will not value make good works unless engaged and qualified to do so, will not interpret the lease for you, and will not alter a report after it is issued to suit one party. Questions about what a clause requires belong with a lawyer or, for retail leases, the VSBC.

Melbourne buildings this covers

Typical jobs include ground-floor retail and upper-level offices in the Melbourne CBD, shopfronts on suburban strips, medical and professional suites in converted houses, and warehouses on industrial estates. Strata-titled offices and shops add another layer, because common property belongs to the owners corporation and the lease covers only the lot.

Timing the two inspections

The lease-start visit is most useful after any work the landlord has promised is finished and before the tenant’s shopfitters, data cablers or racking installers arrive. Once a fit-out is under way, it becomes hard to tell base building damage from fit-out damage. The lease-end visit works best after the tenant has removed their fit-out and cleaned, but before keys are handed back, so there is still time to fix small items rather than argue about them. Book both with enough notice for the agent to arrange keys and alarm codes.

Cost

Commercial reports are quoted on floor area, the number of tenancies, the amount of plant to be recorded and the report format. A lease-end report that must be compared against someone else’s lease-start record takes longer. The dilapidation report cost guide explains how to compare quotes.

What to do next

Gather the lease start date, floor area, any existing condition schedule and the handover or vacate date, then describe the premises in the enquiry form. This site forwards the details to an independent provider, and the inspection terms and fee are settled between you and them.

Send a job enquiry

Frequently asked questions

Who should commission the lease start report, landlord or tenant?

Either can. Landlords often arrange one through their managing agent. A tenant who receives no report should take their own dated photos or commission a report before fitting out, because the baseline protects both sides.

Does a condition report tell me what make good I owe?

No. It records the condition of the premises. What has to be reinstated depends on the lease wording and any attached schedule. For that question, get advice on the lease itself.

Can the report record whether the air conditioner works?

It can note whether visible plant switched on and ran on the day of the visit. Servicing, testing or certifying the plant needs a licensed technician and is a separate job.

We are mid-lease and the shop next door is being rebuilt. What should we record?

Record the shared wall, ceiling, floor, shopfront and any services that pass through the boundary, before the neighbour's demolition starts. Tell the landlord in writing so both parties hold the same record.